1、REPUBLIC OF SIERRA LEONE SIERRA LEONE ROADS AUTHORITY MATOTOKA TO SEFADU ROAD REHABITATION LOT 2(YIYE TO SEFADU) LAB. REPORT NO.:TR-0811-19639-2920Date: CUSTOMER/CLIENT: The First NorthEast Electric Power Engineering Co. (NEPC) PROJECT: Philippines Mariveles 2 x 300 Megawatts Coal Fired Power Projec
2、t, Foundation SAMPLED/SUBMITTED BY: Tong De Gang T.O. No.: NEPC - SYWT - SN - 0050DATE SUBMITTED: PARAMETERS Magnesium Oxide (MgO), % Sulfur Trioxide (SO3), % Loss of Ignition, % Insoluble Residue, % free lime Air Content, % (ASTM C185) Density, g/ml (ASTM C188) Fineness (Blaine) Specific Surface (A
3、STM C-204), cm2/gram Normal Consistency, % (ASTM C187) Setting Time (VICAT), (ASTM C191) Initial Set, minutes47Min. Final Set, hours375Min. Ave. Compressive Strength, Mpa (Psi) (ASTM C109) 3 days12.7 7 days19.5 28 days30.4 China Geo Engg. Corp. / / / RESULTSREQUIREMENTS 6.00 Max. 2800 Min. 12.00 (17
4、40) Min. 19.00 (2755) Min. 28.0 (4060) Min. REMARKS: This report is the result of test performed on the samples submitted 1842 2828 4408 / 26.8 May 16, 2016 PORTLAND CEMENT TEST RESULTS SAMPLE I.D.: Portland Cement- Type I SOURCE: Holcim Portland Cement May 13, 2016 TEST DATA TEST REQUIRED: Quality
5、TestTEST REQUIRED: Quality Test 162/2.7 276/4.6 I. II.PHYSICAL ANALYSIS / / / CHEMICAL ANALYSIS, % (ASTM C-114) 3.00 Max. 3.00 Max. 0.75 Max. 12.00 Max. 1.32 R. E. Velasquez Certified by: Operations ManagerLab. Chemist Tested by: REPUBLIC OF SIERRA LEONE SIERRA LEONE ROADS AUTHORITY MATOTOKA TO SEFADU ROAD REHABITATION LOT 2(YIYE TO SEFADU) REPUBLIC OF SIERRA LEONE SIERRA LEONE ROADS AUTHORITY MATOTOKA TO SEFADU ROAD REHABITATION LOT 2(YIYE TO SEFADU) REPUBLIC OF SIERRA LEONE SIERRA LEONE ROADS AUTHORITY MATOTOKA TO SEFADU ROAD REHABITATION LOT 2(YIYE TO SEFADU)