1、Presentation OnAtox 50 MillThings to do,before proceeding to siteRunning Site-OfficeATOX Raw Mill,Size 50Atox Mill Components and Its Installation Foundation Base frame Gear unitGrinding table Grinding rollersMill HousingsNozzle ring Separator housingsAtox mill components and its Installation Densit

2、 lining Separator partsJoint headHydraulic cylinderPull rodTorque armAccumulatorsAtox mill components and its Installation Separator driveHydraulic and Rollers lube systemsATOX Mill,Circuit of Grinding ForceATOX Mill,Grinding Mode with MaterialATOX Mill,Grinding Mode with MaterialMill FoundationMill

3、 Base FrameMill Base FrameMill Gear PlateMain Gear UnitGrinding TableGrinding Table Wear LinersJoint HeadGrinding Rollers and Center YokeGrinding Rollers and Center YokeMill HousingsNozzle RingDensit Lining On Reject ConeDensit Lining on Mill Housing Bottom PlateDensit Lining on Separator Bearing Sh

4、aft Assy.Separator HousingsSeparator HousingsSeparator Guide VanesSeparator RotorSeparator RotorSeparator Top SectionSeparator Bearing AssemblySeparator Drive UnitsMill Feed ChuteHydraulic CylinderHydraulic RoomWater spray UnitAccumulatorsMill Installation CompleteMill Installation Before and AfterT

5、hings to do before proceeding to siteThings to do,before proceeding to site1.Assignment.2.Turn-key?3.Basic?4.Project organization.5.Who is the PM(project or contract manager)?6.Meeting with PM?7.Special training required?8.Site Manual?9.Safety and security briefings-?Things to do,before proceeding t

6、o siteVisa?Work permit?Forex?Air ticket?Medical insurance?Vaccinations?Time sheet?FQRs?Airport pick-up?Contact persons?Telephone numbers?3.DocumentationStudy the scope of documentation every department,every type,make a list or get a list from the PM/ENGG and tick off.If our FLS scope is a part deli

7、very(basic)who is then making the complete documentation?Things to do,before proceeding to site4.Sundri equipment which require specialists at Site.Scope of equipment?Make?Type?Calculate number of persons and estimated time at Site.Supervisor at lump sum price or hourly paid5.Equipment which require

8、 special storage or safe-keeping at Site.Scope of equipment?Make?Type?Instructions about the storage or safe-keeping?6.Equipment delivered which requires sub-suppliers presenceat commissioning and first start up.Scope of equipment?Make?Type?RUNNING SITE-OFFICERunning site-office The site office is r

9、esponsible that information is prepared about all important decisions and events on Site from the day of mobilisation and until the day of final Field Acceptance Document Current files:-Diary including:Arrival and departure of site-employed personnel.Number and type of main erection equipment used.A

10、rrival and internal flow of equipment.Type,extent and location of performed progress.Obstacles,interruptions,tests performed.Stoppage of work specifying the cause.AccidentsWeather conditions,site conditions(access)Specific directions or instructions from client or others.etc.Running site office-Minu

11、tes of meetings from site meetings-Time schedules.-As shipped drawings and equipment-Instruction manuals covering the total scope of supply-As built drawings and equipment instruction manuals.-Packing lists(shipping document)-Project error reports(FQRs)-Deviation orders-Site instruction manuals-Site

12、 rules covering organisation,accidents,safety,fire protection,protection against burglary and vandalism,housekeeping,-FLS Installation Manual-List of names of all site assigned persons.-Site progress reports.-Memo to ClientRunning site officeREPORTSThe site office is responsible that reporting based

13、 on and if necessary documented by the current site files is prepared and sent to FLS at the times agreed upon or as normal practice to send once in a week.Time sheet,every week/Month Finished Erection certificate Final Acceptance certificateRunning site officeNote:This is reference onlyFinished Erection certificate,Model copyRunning site officeNote:This is reference onlyTime Sheet,Model copyRunning site officeNote:This is reference onlyFinal Acceptance certificate,Model CopyQuestions?End of Presentation.本节内容结束

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 办公、行业 > 各类PPT课件(模板)
版权提示 | 免责声明

1,本文((水泥工艺培训)Atox立磨培训课件.pptx)为本站会员(晟晟文业)主动上传,163文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。
2,用户下载本文档,所消耗的文币(积分)将全额增加到上传者的账号。
3, 若此文所含内容侵犯了您的版权或隐私,请立即通知163文库(发送邮件至3464097650@qq.com或直接QQ联系客服),我们立即给予删除!


侵权处理QQ:3464097650--上传资料QQ:3464097650

【声明】本站为“文档C2C交易模式”,即用户上传的文档直接卖给(下载)用户,本站只是网络空间服务平台,本站所有原创文档下载所得归上传人所有,如您发现上传作品侵犯了您的版权,请立刻联系我们并提供证据,我们将在3个工作日内予以改正。


163文库-Www.163Wenku.Com |网站地图|