1、 CONS P Contractor; Engineer 1.1.2.6 Employers Personnel 1.1.2.9 DAB (Dispute Adjudication Board) CONS 1. General provisions 1.14 Joint and Several Liability (p28) Joint venture/consortium jointly and severally liable / leader / no alter its composition 1.1.1 The Contract (1.1.1.11.1.1.10) (p14) 1.3

2、 Communications (p22) in writing CONS 1. General provisions 1.8 Care and Supply of Documents (p24) two copies / six copies 1.9 Delayed Drawings or Instructions (p26) notice, further notice 1.5 Priority of Documents (p24) 1.1 Definitions 1.1.3 Dates, Tests, Periods and Completion ( p16) Base Date : t

3、he date 28 days prior to the latest date for submission of the Tender Typical sequence of Principal Events during Contracts for Construction Issue of Tender Documents Base Date Submission of Tender 8.1Commencement Date 10.1 Issue of Taking- over Certificate 11.9 Issue of Performance Certificate Issu

4、e of Letter of Acceptance 28d 28d may omission or termination 3. Project execution stage 7) Progress management 4.21 Progress Report (p50) monthly 8.7 Delay Damages (p68) fails : 8.2(p64): pay, between, maximum amount, only damages 9.Tests on Completion (p70) Contractor 9.1 ahead 21d notice tests da

5、te Employer carried out 14 days before completion apply by notice for Taking-Over Certificate 28 days after receiving (a)issue TOC (b)rejection and giving reason fail either (a) or (b) the Work substantially in accordance with the Contract deem have issued TOC 4. Project completion stage 10.Employer

6、s Taking Over 10.2 Employer shall not use any part of the works unless and until the Engineer has issued a TOC for this part. 17.2 (p114) 1.1.3.7 (p18) 18.2 (p120) 14.9 (p100) 4. Project completion stage 11.Defects Liability(p76) Contractor Employer 11.1Completion of Outstanding Work and Remedying D

7、efects 11.4Fail to remedy defect or damage notice a fixed date Fail again (a)carry out the work himself/others(Claim) 11.3Extension of Defects (b)reduction in Price Notification Period 2y (c) terminate the Contract as a whole or part 11.9 issue Performance Certificate 11.11Clearance of Site 28d ( 11.10 remain liable for remains unperformed obligation)

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 大学
版权提示 | 免责声明

1,本文(大学精品课件:合同英4FIDIC合同.ppt)为本站会员(金钥匙文档)主动上传,163文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。
2,用户下载本文档,所消耗的文币(积分)将全额增加到上传者的账号。
3, 若此文所含内容侵犯了您的版权或隐私,请立即通知163文库(发送邮件至3464097650@qq.com或直接QQ联系客服),我们立即给予删除!


侵权处理QQ:3464097650--上传资料QQ:3464097650

【声明】本站为“文档C2C交易模式”,即用户上传的文档直接卖给(下载)用户,本站只是网络空间服务平台,本站所有原创文档下载所得归上传人所有,如您发现上传作品侵犯了您的版权,请立刻联系我们并提供证据,我们将在3个工作日内予以改正。


163文库-Www.163Wenku.Com |网站地图|